The Process Safety Report

The Process Safety Report

Share this post

The Process Safety Report
The Process Safety Report
The HAZOP Technique: Large Facilities

The HAZOP Technique: Large Facilities

Jul 17, 2025
∙ Paid

Share this post

The Process Safety Report
The Process Safety Report
The HAZOP Technique: Large Facilities
Share
Identification of Safeguards

This is the tenth and final post in a series to do with the HAZOPs (Hazard and Operability) technique. The posts in this series so far point are:

  1. The HAZOP Technique

  2. Step 1: Node Selection and Purpose

  3. Step 2: Process Guideword / Safe Limits

  4. Step 3: Identification of Hazards and their Causes

  5. Step 4: ‘Announcement’ of the Hazard

  6. Step 5: Hazard Consequences

  7. Step 6: Predicted Frequency / Results Quality

  8. Step 7: Identification of Safeguards

  9. Step 8: Presence of Persons

  10. Large Facilities

In this post we consider the use of HAZOPs on large facilities.

Keep reading with a 7-day free trial

Subscribe to The Process Safety Report to keep reading this post and get 7 days of free access to the full post archives.

Already a paid subscriber? Sign in
© 2025 Ian Sutton
Privacy ∙ Terms ∙ Collection notice
Start writingGet the app
Substack is the home for great culture

Share